New wing at Liden & Denz St.Petersburg

Seven classrooms and the library were completely redesigned and rebuilt. We replaced all floors, doors, ceilings, walls, windows, electricity and have upgraded the heating system. The new rooms are more spacious, brighter, offer better noise-protection and come with individually adjustable heaters. Especially the last point will be appreciated by students and partners, which take their ecological commitments serious.

opening ceremony new wingThere was a small opening ceremony on the 28 January, coinciding with our by-monthly student reception. The picture shows the lucky students drawn from a ballot, which had the honour to cut through the symbolic ribbon.


Related PostsVerwandte Artikel

Leave a reply